This project has been on
going thought the winter. It started out as an old boathouse with
a garage door on the side. From that we lifted it off the ground
and leveled it, then installed insulation, vapor barrier and sub
flooring. The electrical work was tore out an installed and outlets
added, walls were dry walled and textured, ceiling was paneled,
ceramic tile was installed and sealed and a deck was built on. PAGE